Conditions of Permit for Residential Heating and/or Cooling Equipment Replacement
- Heating, ventilation and air-conditioning systems shall be designed and installed for efficient utilization of energy.
- Equipment and appliances shall be installed in accordance with the conditions of the listing and the manufacturer’s installation instructions.
- Condensate disposal shall be discharged to an approved plumbing fixture according to the manufacturer’s installation instructions.
- All new ductwork shall be sealed by an approved method.
- The ampacity of the conductors supplying the equipment shall not be less than the minimum circuit ampacity marked on the equipment.
Required inspection: Final inspection.
ALL PERMITS:
- A Long Grove Building Department approved set of construction documents must be on-site available for inspections. {Section: 2021 International Residential Code R107.3.1}
- All construction shall comply with the Village of Long Grove codes, amendments, and ordinances.
- All debris, including dumpster, shall be removed from site prior to a final.
- Final site shall be stabilized with topsoil, seed and erosion control blanket or sod prior to a final (where applicable).
- CONSTRUCTION HOURS: Monday through Friday 7:00 a.m. to 7:00 p.m. , Saturday 8:00 a.m. to 5:00 p.m. Construction on Sunday permitted only by an occupant on own residence 10:00 a.m. to 5:00 p.m. {Ordinance No. 2003-O-26}.